Breaking India News Today | In-Depth Reports & Analysis – IndiaNewsWeekBreaking India News Today | In-Depth Reports & Analysis – IndiaNewsWeek
  • Home
  • Nation
  • Politics
  • Economy
  • Sports
  • Entertainment
  • International
  • Technology
  • Auto News
Reading: Parliamentary Panel Warns of Delays in Flood-Prone Area Telemetry Systems Deployment
Share
Breaking India News Today | In-Depth Reports & Analysis – IndiaNewsWeekBreaking India News Today | In-Depth Reports & Analysis – IndiaNewsWeek
  • Home
  • Nation
  • Politics
  • Economy
  • Sports
  • Entertainment
  • International
  • Technology
  • Auto News
© 2024 All Rights Reserved | Powered by India News Week
Trending Now: Stay updated with the latest breaking news from India and around the world
Parliamentary Panel highlights significant delays in installation of telemetry systems in critical flood-prone areas
Breaking India News Today | In-Depth Reports & Analysis – IndiaNewsWeek > Politics > Parliamentary Panel Warns of Delays in Flood-Prone Area Telemetry Systems Deployment
Politics

Parliamentary Panel Warns of Delays in Flood-Prone Area Telemetry Systems Deployment

Politics Desk By Politics Desk September 23, 2025 2 Min Read
Share
SHARE

A Parliamentary Committee has reported substantial delays in the installation of telemetry systems essential for real-time data collection and flood forecasting in critical flood-prone areas. The findings, presented in a performance audit of flood control and forecasting schemes, were submitted to the 17th Lok Sabha and tabled in the 18th Lok Sabha on July 26.

The report reveals that the installation of these telemetry systems has been completed at all stations except for three specific locations: Khanabal in the Chenab division, and Sara Thang and Dambong in the Gangtok division. The delay at Khanabal is linked to an ongoing court case that dates back to 2018, while installations at Sara Thang and Dambong have been stalled since 2017 due to non-clearance from the Forest Department.

The Union Ministry of Jal Shakti informed the Committee that an alternative site for the Khanabal station has been identified, with installation expected to commence soon. However, the Committee expressed frustration regarding the extended delays. The report states, “Noting that an alternate location has since been identified for the installation of the telemetry system in place of Khanabal under the Chenab division, the Committee fails to fathom the reason for the delay in installation of the same.”

In light of these delays, the Committee urged for prompt action to expedite the installation of telemetry systems in Sikkim and other outstanding locations. Additionally, the Committee recommended regular inspections and maintenance for all installed telemetry systems nationwide.

Recognizing India’s varied topography and the unpredictable nature of natural calamities, the Committee emphasized the need for a comprehensive action plan and an effective system to manage worst-case scenarios, thereby enhancing quick-response measures during floods.

TAGGED:Politics
Share This Article
Twitter Copy Link
Previous Article Overnight rain in Kolkata kills at least 7 Tragic Overnight Rainfall in Kolkata Claims Seven Lives
Next Article Rupee drops 47 paise to hit all-time low of 88.75 as US visa fee hike, tariffs heap pressure Rupee Hits Record Low of 88.75 Amid US Visa Fee Increase
Leave a comment Leave a comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Latest News

AI emergence puts spotlight on CCTV companies’ stocks

Surging AI Growth Boosts Market Attention on CCTV Companies’ Stock Performance

October 7, 2026
Photos: School blockades, street protests grip France

School Blockades and Protests Erupt Across France Amid Rising Tensions

October 7, 2026
HEG Advanced Materials surges 8% on fresh orders, demerger plans

HEG Advanced Materials Soars 8% Following New Orders and Demerger Announcements

October 6, 2026
Over 59% of NSE stock futures volume clustered around expiry in September: Vtrender

September Sees 59% of NSE Stock Futures Volume Concentrated Around Expiry, Reports Vtrender

October 6, 2026
Jane Street challenges SEBI probe, denies market manipulation charges

Jane Street Fights Back Against SEBI’s Probe, Rejects Market Manipulation Allegations

October 6, 2026
Clastek Engineering files DRHP for IPO on NSE Emerge

Clastek Engineering Submits DRHP for Upcoming IPO on NSE Emerge Platform

October 6, 2026

You Might Also Like

Microsoft Enhances Azure Security Features to Prevent Unauthorized Access to Sensitive Data

4 Min Read
Politics

Indian Muslims Celebrate Eid Amid Strict Public Prayer Regulations and Security Measures

5 Min Read
Politics

Muslim Nations Encouraged to Collaborate Against Israel Amid Rising Tensions

4 Min Read
Politics

Israel Plans Demolition of Homes for Two Palestinians Amid Ongoing Tensions

5 Min Read

About IndiaNewsWeek

IndiaNewsWeek is your trusted source for breaking news, in-depth analysis, and comprehensive coverage of India and the world. We deliver accurate, timely reporting across politics, economy, sports, entertainment, and technology.

contact@indianewsweek.com

Quick Links

  • Nation
  • Politics
  • Economy
  • International
  • Sports
  • Entertainment

More Sections

  • Technology
  • Auto News
  • Education
  • About Us
  • Contact
  • Privacy Policy

Stay Connected

Follow us on social media for the latest updates and breaking news.

Facebook
X (Twitter)
YouTube
Follow US
© 2026 IndiaNewsWeek. All Rights Reserved.
Welcome Back!

Sign in to your account

Lost your password?